Retour aux projets

11636.2;8 PFIW-IW

Optimization and Planning of Hydro-Power Production

Résumé

Optimization and Planning of Hydro-Power Production

Textes supplémentaires

Abstract

The goal of this project is a prototype software which assists power producers with an optimal medium-term production strategy for typically Swiss hydro storage power plants. Key aspects of the software is the integration of the market and regulatory conditions in Switzerland (e.g. ancillary services) as well as the consideration of uncertain factors (e.g. water inflows). With this software it shall be not only possible to plan the energy production more profitable and more robust but also to plan it with a minimized and known risk.

Participants

Göran Andersson

Kontaktperson

andersson@eeh.ee.ethz.ch

ETH Zürich Göran Andersson Rämistrasse 101 Swiss Federal Institute of Technolo 8006 Zürich ZH CH

Détails du projet

Office de recherche
INNOSUISSE
Statut du projet
Abgeschlossen
Type de projet
Forschungsprojekt
Date de début
2010-11-30
Date de fin
2013-11-03
Coûts totaux approuvés
CHF 144000.00
Section
23 Förderbereich Engineering
Domaine politique NABS
Nicht aufteilbare / nicht zuteilbare Forschung

Disciplines de recherche

  • T190 Electrical engineering 100.0%