We can't find the internet
Attempting to reconnect
11636.2;8 PFIW-IW
Optimization and Planning of Hydro-Power Production
Résumé
Optimization and Planning of Hydro-Power Production
Textes supplémentaires
Abstract
The goal of this project is a prototype software which assists power producers with an optimal medium-term production strategy for typically Swiss hydro storage power plants. Key aspects of the software is the integration of the market and regulatory conditions in Switzerland (e.g. ancillary services) as well as the consideration of uncertain factors (e.g. water inflows). With this software it shall be not only possible to plan the energy production more profitable and more robust but also to plan it with a minimized and known risk.
Participants
Göran Andersson
Kontaktperson
andersson@eeh.ee.ethz.ch
ETH Zürich Göran Andersson Rämistrasse 101 Swiss Federal Institute of Technolo 8006 Zürich ZH CH
Détails du projet
- Office de recherche
- INNOSUISSE
- Statut du projet
- Abgeschlossen
- Type de projet
- Forschungsprojekt
- Date de début
- 2010-11-30
- Date de fin
- 2013-11-03
- Coûts totaux approuvés
- CHF 144000.00
- Section
- 23 Förderbereich Engineering
- Domaine politique NABS
- Nicht aufteilbare / nicht zuteilbare Forschung
Disciplines de recherche
- T190 Electrical engineering 100.0%