Zurück zu Projekte

11636.2;8 PFIW-IW

Optimization and Planning of Hydro-Power Production

Zusammenfassung

Optimization and Planning of Hydro-Power Production

Weitere Texte

Abstract

The goal of this project is a prototype software which assists power producers with an optimal medium-term production strategy for typically Swiss hydro storage power plants. Key aspects of the software is the integration of the market and regulatory conditions in Switzerland (e.g. ancillary services) as well as the consideration of uncertain factors (e.g. water inflows). With this software it shall be not only possible to plan the energy production more profitable and more robust but also to plan it with a minimized and known risk.

Beteiligte

Göran Andersson

Kontaktperson

andersson@eeh.ee.ethz.ch

ETH Zürich Göran Andersson Rämistrasse 101 Swiss Federal Institute of Technolo 8006 Zürich ZH CH

Projektdetails

Forschungsstelle
INNOSUISSE
Projektstatus
Abgeschlossen
Projekttyp
Forschungsprojekt
Startdatum
2010-11-30
Enddatum
2013-11-03
Bewilligte Gesamtkosten
CHF 144000.00
Sektion
23 Förderbereich Engineering
NABS Politikbereich
Nicht aufteilbare / nicht zuteilbare Forschung

Forschungsdisziplinen

  • T190 Electrical engineering 100.0%