11636.2;8 PFIW-IW
Optimization and Planning of Hydro-Power Production
Zusammenfassung
Optimization and Planning of Hydro-Power Production
Weitere Texte
Abstract
The goal of this project is a prototype software which assists power producers with an optimal medium-term production strategy for typically Swiss hydro storage power plants. Key aspects of the software is the integration of the market and regulatory conditions in Switzerland (e.g. ancillary services) as well as the consideration of uncertain factors (e.g. water inflows). With this software it shall be not only possible to plan the energy production more profitable and more robust but also to plan it with a minimized and known risk.
Beteiligte
Göran Andersson
Kontaktperson
andersson@eeh.ee.ethz.ch
ETH Zürich Göran Andersson Rämistrasse 101 Swiss Federal Institute of Technolo 8006 Zürich ZH CH
Projektdetails
- Forschungsstelle
- INNOSUISSE
- Projektstatus
- Abgeschlossen
- Projekttyp
- Forschungsprojekt
- Startdatum
- 2010-11-30
- Enddatum
- 2013-11-03
- Bewilligte Gesamtkosten
- CHF 144000.00
- Sektion
- 23 Förderbereich Engineering
- NABS Politikbereich
- Nicht aufteilbare / nicht zuteilbare Forschung
Forschungsdisziplinen
- T190 Electrical engineering 100.0%