Retour aux projets

ExSt.2013.189

Optimizing the IAEA Safeguard System

Résumé

Even though the additional protocol of the NPT is now in force in 109 NPT States parties which widely recognize its importance, persisting factors slow down its universalization and full implementation. However, the remaining obstacles can be tackled through both external and internal incentives. Amongst the latter, optimization of the IAEA safeguards system to ensure its effectiveness and efficiency can help promote universalization of the AP. The current evolution of the safeguards system tending to better allocate safeguards activities and resources, doing away with a quantitative approach and promoting qualitative, customized implementation of safeguards is reviewed in Chapter 2. The latter suggests that despite ongoing and positive efforts, remaining difficulties slow down the move to a real ‘analytical’ or ‘factors’ driven system. Chapter 3 therefore looks at ways to overcome weaknesses in safeguards approaches, institutional and collaborative practices, in order to develop safeguards resources and measures where the proliferation risk lies and not necessarily on States with large nuclear power and industries. In that sense, optimization implies targeting verification. Three main interconnected tracks are suggested: enhanced selectiveness of verification efforts could be based on a more flexible application of safeguards allowing for transparency and openness dividends; it would require improved institutional transparency; finally, it could be supported by furthering cooperation both at the regional level and with relevant international organisations.

Textes supplémentaires

Schlüsselwörter

International Atomic Energy Agency, nuclear disarmament, non-proliferation, Additional Protocol, Non Proliferation Treaty, safeguards, verification

Auskunft

Impressum

Gesetzliche Grundlage

Belastetes Budget

Auftragnehmer

Détails du projet

Office de recherche
EDA
Statut du projet
Abgeschlossen
Type de projet
Externe Studie
Date de début
2013-09-16
Date de fin
2013-09-16
Coûts totaux approuvés
CHF 43200.00
Section
externe Studien
Domaine politique NABS
-

Thèmes

Sicherheit Energie Schweiz und Ausland