We can't find the internet
Attempting to reconnect
19343.1 PFIW-IW
19343.1 PFIW-IW
Résumé
RENOVHydro: Development of a Decision Making Assistant for Hydropower Project Potential Evaluation and Optimization
Textes supplémentaires
Abstract
The 2050 Energy Strategy is based on a massive development of renewable energy sources. Swiss hydropower stations are key components of this strategy considering in particular their systematic upgrade and extension. This proposed multi-disciplinary project aims to develop a numerical tool for assessing the true hydropower renovation potential of these hydropower stations by considering both electricity generation increase and services to the grid.
Participants
Christophe Nicolet
Wirtschaftspartner
christophe.nicolet@powervision-eng.ch
Power Vision Engineering SaRL Christophe Nicolet Chemin des Champs-Courbes 1 1024 Ecublens VD CH
François Avellan
Kontaktperson
francois.avellan@epfl.ch
EPFL Laboratoire de Machines Hydraulique François Avellan Avenue de Cour 33 Bis 1015 Lausanne VD CH
Détails du projet
- Office de recherche
- INNOSUISSE
- Statut du projet
- Abgeschlossen
- Type de projet
- Forschungsprojekt
- Date de début
- 2016-12-31
- Date de fin
- 2019-12-31
- Coûts totaux approuvés
- CHF 581234.00
- Section
- 23 Förderbereich Engineering
- Domaine politique NABS
- Industrielle Produktivität und Technologie
Disciplines de recherche
- T210 Mechanical engineering,hydraulics,vacuum techn.,vibration and acoustic eng. 100.0%