Zurück zu Projekte

25109.1 PFEN-IW

25109.1 PFEN-IW

Zusammenfassung

System level optimization of variable speed drives for pumped hydro storage plants

Weitere Texte

Abstract

The aim of the project is to identify and develop optimal power electronics system configurations for converterfed pumped hydro storage plants. Increased penetration of high-power multilevel converters into this sector increases operational flexibility and efficiency, but it requires optimal use of resources, features and materials allocated to different parts of the systems: transformers, converters, filters and electrical machines, to increase benefits on the system level.

Beteiligte

Drazen Dujic

Kontaktperson

drazen.dujic@epfl.ch

EPFL EPFL STI IEL PEL Drazen Dujic Station 11 1015 Lausanne VD CH

Alexander Schwery

Wirtschaftspartner

alexander.schwery@ge.com

GE Renewable Energy Alexander Schwery Zentralstrasse 40 5242 Birr AG CH

Projektdetails

Forschungsstelle
INNOSUISSE
Projektstatus
Abgeschlossen
Projekttyp
Forschungsprojekt
Startdatum
2017-04-30
Enddatum
2020-04-30
Bewilligte Gesamtkosten
CHF 358200.00
Sektion
23 Förderbereich Engineering
NABS Politikbereich
Industrielle Produktivität und Technologie

Forschungsdisziplinen

  • T190 Electrical engineering 100.0%