We can't find the internet
Attempting to reconnect
19240.1 PFIW-IW
Fatigue strengthening of metallic bridge connections using pre-stressed CFRP laminates
Zusammenfassung
Fatigue strengthening of metallic bridge connections using pre-stressed CFRP laminates
Weitere Texte
Abstract
Nearly 70% of all metallic bridges in Europe are older than 50 years. The majority of fatigue damages in this type of bridges were reported in riveted connections. In this project, a pre-stressed CFRP retrofit system for strengthening of bridge connections will be developed. Several small- and large-scale connections will be tested under static and fatigue loadings. Finally, in order to show the efficiency of the CFRP retrofit system, it will be mounted on an old SBB railway metallic bridge in Switzerland.
Beteiligte
Martin Hüppi
Wirtschaftspartner
martin.hueppi@sp-reinforcement.ch
S&P Clever Reinforcement Company AG CHE-107.430.431 Martin Hüppi Seewernstrasse 127 6423 Seewen SZ CH
Masoud Motavalli
Kontaktperson
Masoud.motavalli@empa.ch
EMPA Masoud Motavalli Überlandstrasse 129 8600 Dübendorf ZH CH
Projektdetails
- Forschungsstelle
- INNOSUISSE
- Projektstatus
- Abgeschlossen
- Projekttyp
- Forschungsprojekt
- Startdatum
- 2017-04-30
- Enddatum
- 2020-08-31
- Bewilligte Gesamtkosten
- CHF 242237.00
- Sektion
- 23 Förderbereich Engineering
- NABS Politikbereich
- Industrielle Produktivität und Technologie
Forschungsdisziplinen
- T220 Civil engineering,hydraulic engineering,offshore technology,soil mechanics 100.0%