Zurück zu Projekte

19240.1 PFIW-IW

Fatigue strengthening of metallic bridge connections using pre-stressed CFRP laminates

Zusammenfassung

Fatigue strengthening of metallic bridge connections using pre-stressed CFRP laminates

Weitere Texte

Abstract

Nearly 70% of all metallic bridges in Europe are older than 50 years. The majority of fatigue damages in this type of bridges were reported in riveted connections. In this project, a pre-stressed CFRP retrofit system for strengthening of bridge connections will be developed. Several small- and large-scale connections will be tested under static and fatigue loadings. Finally, in order to show the efficiency of the CFRP retrofit system, it will be mounted on an old SBB railway metallic bridge in Switzerland.

Beteiligte

Martin Hüppi

Wirtschaftspartner

martin.hueppi@sp-reinforcement.ch

S&P Clever Reinforcement Company AG CHE-107.430.431 Martin Hüppi Seewernstrasse 127 6423 Seewen SZ CH

Masoud Motavalli

Kontaktperson

Masoud.motavalli@empa.ch

EMPA Masoud Motavalli Überlandstrasse 129 8600 Dübendorf ZH CH

Projektdetails

Forschungsstelle
INNOSUISSE
Projektstatus
Abgeschlossen
Projekttyp
Forschungsprojekt
Startdatum
2017-04-30
Enddatum
2020-08-31
Bewilligte Gesamtkosten
CHF 242237.00
Sektion
23 Förderbereich Engineering
NABS Politikbereich
Industrielle Produktivität und Technologie

Forschungsdisziplinen

  • T220 Civil engineering,hydraulic engineering,offshore technology,soil mechanics 100.0%