We can't find the internet
Attempting to reconnect
15738.1 PFEN-IW
Development of new ceramic composite thermal protection systems for future high efficiency gas turbine - CERATHERM
Résumé
Development of new ceramic composite thermal protection systems for future high efficiency gas turbine - CERATHERM
Textes supplémentaires
Abstract
The aim of this project is to develop new high temperature (> 1600°C) ceramic based thermal protection system for the next generation gas turbines. The increase of its surface temperature capability will improve the ecologic footprint of Alstom's turbine fleet, reducing NOx and CO2 emissions in the power generation sector. The high technological input required for such a product portfolio allows to strengthen Alstom's position in Switzerland, being in direct global competition
Participants
Christian Verhoeven
Wirtschaftspartner
christian.verhoeven@power.alstom.com
ALSTOM (Switzerland) AG Christian Verhoeven Brown-Boveri-Strasse 7 5401 Baden AG CH
Thomas Graule
Kontaktperson
thomas.graule@empa.ch
EMPA Thomas Graule Überlandstrasse 129 8600 Dübendorf ZH CH
Détails du projet
- Office de recherche
- INNOSUISSE
- Statut du projet
- Abgeschlossen
- Type de projet
- Forschungsprojekt
- Date de début
- 2013-08-31
- Date de fin
- 2016-02-29
- Coûts totaux approuvés
- CHF 766688.00
- Section
- 23 Förderbereich Engineering
- Domaine politique NABS
- Industrielle Produktivität und Technologie
Disciplines de recherche
- T150 Material technology 100.0%