12993.1;8 PFIW-IW

Fatigue strengthening of metallic riveted bridges using un-bonded pre-stressed CFRP plates

Résumé

Fatigue strengthening of metallic riveted bridges using un-bonded pre-stressed CFRP plates

Textes supplémentaires

Abstract

Depending on the fatigue load history of riveted bridges and environmental conditions, riveted bridges may be seriously deteriorated. In particular, floor beams may be severely rusted, rivets becoming loose, and stringer-to-floor beams connections could have fatigue damage. An effective method to reinforce these bridges is to use externally bonded CFRP plates. However this method cannot be generally used for riveted bridges due to the high density of rivets on the floor beams. Therefore, it is proposed in this project to develop an easy to install prestressed un-bonded reinforcement system to be used specifically for riveted bridges.

Participants

Masoud Motavalli

Kontaktperson

Masoud.motavalli@empa.ch

EMPA Masoud Motavalli Ueberlandstrasse 129 8600 Dübendorf ZH CH

Détails du projet

Office de recherche
INNOSUISSE
Statut du projet
Abgeschlossen
Type de projet
Forschungsprojekt
Date de début
2012-02-29
Date de fin
2014-09-02
Coûts totaux approuvés
CHF 203070.00
Section
23 Förderbereich Engineering
Domaine politique NABS
Nicht aufteilbare / nicht zuteilbare Forschung

Disciplines de recherche

  • T220 Civil engineering,hydraulic engineering,offshore technology,soil mechanics 100.0%