We can't find the internet
Attempting to reconnect
12339.2;5 PFIW-IW
Development of an advanced low temperature asphalt production process and unit
Résumé
Development of an advanced low temperature asphalt production process and unit
Textes supplémentaires
Abstract
Asphalt pavements for roads are traditionally constructed with hot mix asphalt. In the last few years the search for new asphalt technologies to reduce both energy consumption and CO2 production has been intensified. The project proposed aims at evaluating and improving semi-warm and warm foam asphalt for transfer from laboratory scale to the mix plant. The examinations focus on material processing (foam generation and gravel coating) and include simulation of traffic road on asphalt specimens to quantify the long term material performance.
Participants
Manfred Partl
Kontaktperson
manfred.partl@empa.ch
EMPA Manfred Partl Überlandstrasse 129 8600 Dübendorf ZH CH
Détails du projet
- Office de recherche
- INNOSUISSE
- Statut du projet
- Abgeschlossen
- Type de projet
- Forschungsprojekt
- Date de début
- 2011-09-30
- Date de fin
- 2014-09-08
- Coûts totaux approuvés
- CHF 281560.00
- Section
- 23 Förderbereich Engineering
- Domaine politique NABS
- Nicht aufteilbare / nicht zuteilbare Forschung
Disciplines de recherche
- T150 Material technology 100.0%