Retour aux projets

12339.2;5 PFIW-IW

Development of an advanced low temperature asphalt production process and unit

Résumé

Development of an advanced low temperature asphalt production process and unit

Textes supplémentaires

Abstract

Asphalt pavements for roads are traditionally constructed with hot mix asphalt. In the last few years the search for new asphalt technologies to reduce both energy consumption and CO2 production has been intensified. The project proposed aims at evaluating and improving semi-warm and warm foam asphalt for transfer from laboratory scale to the mix plant. The examinations focus on material processing (foam generation and gravel coating) and include simulation of traffic road on asphalt specimens to quantify the long term material performance.

Participants

Manfred Partl

Kontaktperson

manfred.partl@empa.ch

EMPA Manfred Partl Überlandstrasse 129 8600 Dübendorf ZH CH

Détails du projet

Office de recherche
INNOSUISSE
Statut du projet
Abgeschlossen
Type de projet
Forschungsprojekt
Date de début
2011-09-30
Date de fin
2014-09-08
Coûts totaux approuvés
CHF 281560.00
Section
23 Förderbereich Engineering
Domaine politique NABS
Nicht aufteilbare / nicht zuteilbare Forschung

Disciplines de recherche

  • T150 Material technology 100.0%