Zurück zu Projekte

17902.3 PFEN-IW

17902.3 PFEN-IW

Zusammenfassung

FLEXSTOR - solutions for flexible operation of storage hydropower plants in changing environment and market conditions

Weitere Texte

Abstract

Swiss hydropower production is endogenous, renewable and partially storable. This project aims at improving its climate and market resilience, as well as eco-compliance. New tools and methodologies are proposed for design and operation of flexible hydropower schemes. Flexibility of storage plants is addressed in terms of production scheduling and sediment management. KWO's case study is replicable in other hydropower portfolios.

Beteiligte

Andres Fankhauser

Wirtschaftspartner

andres.fankhauser@kwo.ch

Kraftwerke Oberhasli AG Andres Fankhauser Grimselstrasse 3862 Innertkirchen BE CH

Anton Schleiss

Kontaktperson

anton.schleiss@epfl.ch

EPFL Anton Schleiss Station 18, Bâtiment GC A3504 1015 Lausanne VD CH

Projektdetails

Forschungsstelle
INNOSUISSE
Projektstatus
Abgeschlossen
Projekttyp
Forschungsprojekt
Startdatum
2016-08-31
Enddatum
2019-02-28
Bewilligte Gesamtkosten
CHF 674836.00
Sektion
23 Förderbereich Engineering
NABS Politikbereich
Industrielle Produktivität und Technologie

Forschungsdisziplinen

  • T130 Production technology 100.0%